Page 25 - European Energy Innovation magazine - autumn 2022 edition
P. 25

Autumn 2022 European Energy Innovation
                                                                                  COMMUNICATION        25






                                             project, followed subsequently by   An effort will also be made to
                                             Brussels (Belgium), Zaragoza (Spain),   utilise the solutions elsewhere
                                             Botoșani (Romania) Ptolemaida    in Turku, especially in Turku
                                             (Greece), Gabrovo (Bulgaria) and   Science Park and the Runosmäki
                                             Severodonetsk (Ukraine) (Latest   residential area.
                                             information before the city was taken
                                             over by Russian forces was that the   “The Response project is also one
                                             Ukrainians want to stay involved in   way of bringing Turku closer to its
                                             the project)                     goal of being carbon neutral by 2029”,
                                                                              says Lamoureux.
                                             “The idea is that the subsequent
                                             cities will draw up a plan on how they   Lecturer Samuli Ranta from Turku
                                             can implement the innovations of the   University of Applied Sciences was
                                             pilot cities.”                   also interviewed for this article. ●



                                                  Fast travel from Turku Science Park

                                                to the Helsinki Metropolitan Area

                                                An internationally signifi cant cluster of expertise merging science and
                                                business in line with sustainable development is being built in Turku. The
                                                one-hour Turku Rail Link will add Turku Science Park under the commuting
                                                umbrella of the Helsinki Metropolitan Area.
                                                A fairly compact area in Turku features two universities of applied sciences,
                                                the Student Village, the hospital complex and a signifi cant number of
            October 2022 will see the start of a   businesses.
            three-year monitoring period with the
            purpose of gathering information on   Director of Urban Planning Timo Hintsanen says that the area in question,
            how functional and practical the new   titled Turku Science Park, is now being expanded and made into a more
            innovations are.                    integrated entity.
                                                “The idea is to promote encounters that facilitate creative innovations.
            “Whenever you develop something     Cooperation also opens up other synergic benefi ts; for example, the area
            new, you’ll have some inventions that   already has a new resource-smart laboratory shared by two universities.”
            work well and others that are less
            effective than expected. But even a   Turku Science Park is mainly located in the districts of Kupittaa and Itäharju.
            single new solution can have a huge   The plan is to integrate these two areas even more closely together with a
            impact if it is something that can be   deck structure that will reach across the railway and motorway and feature
            used in other places as well.”      several green areas.
                                                On the other hand, the railway will connect the area closely to the Helsinki
            Lamoureux mentions some             Metropolitan Area. With the high-speed Turku Rail Link, the journey from the
            more innovations in Tyyssija: “The   Helsinki Metropolitan Area to Turku Science Park would take about an hour.
            apartments have sensors that help
            optimise heating. Tyyssija will also   “And within Turku Science Park, everything would be less than a 10 minute
            have a V2G charging point for electric   walk away.”
            cars, which will make it possible for   The area is also well-connected to the rest of Turku:
            residents to sell electricity stored in   “There is a plan for a tramway to pass through the Science Park, and the area
            their car batteries to the grid if they   is easy to reach by bus as well. We’ll also have urban planning that supports
            do not need it for themselves.”
                                                cycling and walking – but primarily not private car use.”
            Spreading innovations around        Construction is already ongoing in Turku Science Park, and the entire area will
            The objective of the Response project   be completed by 2050. The aim is that, by then, more than one million new
            is to specifi cally create solutions that   square metres will have been built in the area, with apartments for more than
            can be reproduced. Turku and Dijon   20,000 Turku residents and over 10,000 new jobs created compared to today.
            in France are the pilot sites of the



            www.europeanenergyinnovation.eu
   20   21   22   23   24   25   26   27   28   29   30