Page 27 - European Energy Innovation - autumn 2018 publication
P. 27

Autumn 2018 European Energy Innovation  27

                                                            COMMUNICATION

ORC-PLUS Project

An innovative CSP-TES system
for Smart Grids applications

The ORC-PLUS (Organic Rankine              The validation process adopted          Green Energy Park (GEP) of IRESEN
Cycle – Prototype Link to Storage          by the Project includes both a           Contact information
Unit) Project is a H2020 European          techno-economic analysis of two
Project (Call: LCE-03-2014 Innovation      different kind of TES systems at          Contact information
Action Grant Agreement 657690).            prototype level, and a validation of      Email: walter.gaggioli@enea.it
The Project Consortium is composed         the technology at pre-commercial          Tel: +39 (0)6 30486212
by ENEA (coordinator), F-ISE, CIC,         scale demonstrator level. Actually        Web: www.orc-plus.eu.
IRESEN, ENERRAY SpA, Soltigua Srl,         the demonstrator plant is under
Euronovia, and includes also the third     construction inside IRESEN’s Green
parties EXERGY SpA and ENERRAY             Energy Park located in Benguerir
Morocco SAS.                               (Morocco), and its put in exercise
                                           is scheduled for the next January
The Project aims to develop an             2019. In the final design of the
innovative Thermal Energy Storage          demonstrator plant, have been
(TES) system and a set of engineering      preferred technical solutions that
solutions optimized for a mid-size         limit the environmental impact and
CSP (Concentrating Solar Power)            that allow the activation of possible
plant coupled with an Organic              chains of domestic production
Rankine Cycle (ORC) turbine of             of some components, or of the
1MWe. The targets of the Project           provision services.
are the validation of a form of
decentralized power system, based          The reference size of the thermal
on the CSP technologies specialized        energy capacity of the TES system
for the Morocco territory, and the         has been fixed at about 20MWht,
demonstration of the capability to use     since this value allows the ORC-
a TES system in a plant of this size.      PLUS plant a max load of 5MWt, in
                                           order to cover a power load peak
Such experiences could also be             between 6 pm and 10 pm of a
beneficial for other arid areas of the     typical Moroccan little town. The
Mediterranean region, where the            TES system will be fed by 3 parallel
grid power peak load represents a          hydraulic Fresnel solar collectors
serious problem of management of           loops. The heat transfer fluid used is
the local power grid, and where there      an environmentally friendly mineral
is not the availability of other back up   oil operating in the temperature range
power systems (e.g. hydraulic power        from 180°C to 300°C. The target value
stations) to regulate the fluctuations     of LCOE (Levelized COst of Energy)
of the power in such grids. The            was fixed at 0,27 €/kWhe.
ORC-PLUS Project will contribute
to overcome the present limitation         The ORC-PLUS technology represents
to the expansion of mid-sized CSP          a new model of decentralized power
plants. In fact actually a limit for this  production for remote areas and even
kind of CSP plant is represented by        small industries that need affordable,
the lack of technical solutions of         renewable power and heat. The ORC-
TES, specialized for this sizes and        PLUS technology was thought to be
validated in a relevant industrial         an opportunity of development for
environment.                               disadvantaged areas. l

www.europeanenergyinnovation.eu
   22   23   24   25   26   27   28   29   30   31   32